Contact Us
Let's talk about your next project.

Looking for a new career with BASE?
View Our Current Job Openings.

Phone: 1-855-879-5973
Our Offices:
10940 – 92 Avenue, Grande Prairie, AB T8V 6B5
#102, 1212 – 1 Street SE, Calgary, AB T2G 2H8
3424 – 78 Avenue, Edmonton, AB T6B 2X9
 
Our Geotechnical Laboratories:
Unit 4 10902 – 92 Avenue, Grande Prairie, AB T8V 6B5
Bay 5 6115 – 4 Street SE, Calgary, AB T2H 2H9
3424 – 78 Avenue, Edmonton, AB T6B 2X9
BASE
  • This field is for validation purposes and should be left unchanged.
By submitting, you consent to Beairsto & Associates Engineering Ltd. processing your information in accordance with our Privacy Policy. We take your privacy seriously; opt out of email updates at any time.
 
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Contact Us
Let's talk about your next project.

Looking for a new career with BASE?
View Our Current Job Openings.

Phone: 1-855-879-5973
Our Offices:
10940 – 92 Avenue, Grande Prairie, AB T8V 6B5
#102, 1212 – 1 Street SE, Calgary, AB T2G 2H8
3424 – 78 Avenue, Edmonton, AB T6B 2X9
 
Our Geotechnical Laboratories:
Unit 4 10902 – 92 Avenue, Grande Prairie, AB T8V 6B5
Bay 5 6115 – 4 Street SE, Calgary, AB T2H 2H9
3424 – 78 Avenue, Edmonton, AB T6B 2X9
BASE
  • This field is for validation purposes and should be left unchanged.
By submitting, you consent to Beairsto & Associates Engineering Ltd. processing your information in accordance with our Privacy Policy. We take your privacy seriously; opt out of email updates at any time.
 
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

The Ranch is a 150 acre residential subdivision comprising of large 2-4 acre lots in the County of Grande Prairie. It is located just north of the Wapiti River valley at NE20-70-6-W6M. The first phase of construction commenced in the spring of 2010 with the development of 8 lots including 620m of water mains and gravel roads. Phase 2 followed in the fall of 2010 with an additional 6 lots and another 465m of water mains and roads. The construction of Phase 3 was completed in 2011.

Some of the project highlights to this point include:

  • Design and construction supervision of over 1000m of internal gravel roads and water mains for lot servicing.
  • Stormwater drainage plan designed around pre-development contours and historical drainage patterns.
  • Engineering design to account for roads constructed over peat/marsh areas and very sandy subgrade conditions.
  • Design and construction supervision of a low pressure water system linking the West Aquatera low pressure water main network.
  • Building restrictions in place including minimum footing elevations due to a high water table and relatively flat terrain in the area.
  • Successful completion of project within budgeted parameters.

The Ranch

County of Grande Prairie, Alberta

Disciples Involved

Country Roads, Water and Service Connection and Storm Water management

Project Address

County of Grande Prairie, Alberta

Key Personnel

Kraig Gramlick, P. Eng.