As with all municipalities it is important to maintain the existing infrastructure throughout the City. For this reason the City has an annual Road Rehabilitation and Overlay Program. For this project we are required to supply the design, tender and construction supervision for road rehabilitation or overlay sites for 2012 to 2014 construction seasons. In addition we were required to complete the design for road rehabilitation or overlay sites for 2015. This project also covers the road resurfacing and crack repair for 2012 and 2014.
Some of the project highlights are:
- Design and construction inspection for sites requiring road reconstruction including the replacement of sidewalks (2012 to 2014 construction).
- Design and construction inspection for sites requiring asphalt overlay including the replacement of sidewalks (2012 to 2014).
- Design of storm sewer upgrades along 105th Avenue to be completed in conjunction with the road rehabilitation.
- Project budget – $32.7 million.