Contact Us
Let's talk about your next project.
Looking for a new career with Base? View Our Current Job Openings.
Phone: 1-855-879-5973

 

10940 – 92 Avenue
Grande Prairie, AB
T8V 6B5

#101, 1212 – 1 Street SE
Calgary, AB
T2G 2H8

#190, 550 – 71 Avenue SE
Calgary, AB
T2H 0S6

3424 – 78 Avenue
Edmonton, AB
T6B 2X8

BASE

By submitting, you consent to Beairsto & Associates Engineering & Survey processing your information in accordance with our Privacy Policy. We take your privacy seriously; opt out of email updates at any time.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Contact Us
Let's talk about your next project.
Looking for a new career with Base? View Our Current Job Openings.
Phone: 1-855-879-5973

 

10940 – 92 Avenue
Grande Prairie, AB
T8V 6B5

#101, 1212 – 1 Street SE
Calgary, AB
T2G 2H8

#190, 550 – 71 Avenue SE
Calgary, AB
T2H 0S6

3424 – 78 Avenue
Edmonton, AB
T6B 2X8

BASE

By submitting, you consent to Beairsto & Associates Engineering & Survey processing your information in accordance with our Privacy Policy. We take your privacy seriously; opt out of email updates at any time.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

As with all municipalities it is important to maintain the existing infrastructure throughout the City. For this reason the City has an annual Road Rehabilitation and Overlay Program. For this project we are required to supply the design, tender and construction supervision for road rehabilitation or overlay sites for 2012 to 2014 construction seasons. In addition we were required to complete the design for road rehabilitation or overlay sites for 2015. This project also covers the road resurfacing and crack repair for 2012 and 2014.

Some of the project highlights are:

  • Design and construction inspection for sites requiring road reconstruction including the replacement of sidewalks (2012 to 2014 construction).
  • Design and construction inspection for sites requiring asphalt overlay including the replacement of sidewalks (2012 to 2014).
  • Design of storm sewer upgrades along 105th Avenue to be completed in conjunction with the road rehabilitation.
  • Project budget – $32.7 million.

Road Rehabilitation, Road Overlay, Road Resurfacing & Crack Repair

Grande Prairie, Alberta

Disciples Involved

Road Construction, Storm Drainage

Project Address

Grande Prairie, Alberta

Key Personnel