Contact Us
Let's talk about your next project.
Looking for a new career with Base? View Our Current Job Openings.
Phone: 1-855-879-5973

 

10940 – 92 Avenue
Grande Prairie, AB
T8V 6B5

#101, 1212 – 1 Street SE
Calgary, AB
T2G 2H8

#190, 550 – 71 Avenue SE
Calgary, AB
T2H 0S6

3424 – 78 Avenue
Edmonton, AB
T6B 2X8

BASE

By submitting, you consent to Beairsto & Associates Engineering & Survey processing your information in accordance with our Privacy Policy. We take your privacy seriously; opt out of email updates at any time.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Contact Us
Let's talk about your next project.
Looking for a new career with Base? View Our Current Job Openings.
Phone: 1-855-879-5973

 

10940 – 92 Avenue
Grande Prairie, AB
T8V 6B5

#101, 1212 – 1 Street SE
Calgary, AB
T2G 2H8

#190, 550 – 71 Avenue SE
Calgary, AB
T2H 0S6

3424 – 78 Avenue
Edmonton, AB
T6B 2X8

BASE

By submitting, you consent to Beairsto & Associates Engineering & Survey processing your information in accordance with our Privacy Policy. We take your privacy seriously; opt out of email updates at any time.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Beairsto & Associates Engineering Ltd. (BASE) was contracted by Horizon North Manufacturing to provide the engineering support for the structural, mechanical, and electrical scopes of work for the Imperial Oil Kearl Lake camp project. The camp included 450 individual executive level dormitory rooms, each with individual bathrooms, connecting corridors, a commercial kitchen and dining room, recreation and lounge spaces, and a Transport Canada approved flight center. The entire complex is composed of premanufactured wood frame modular units on an engineered screw pile foundation. BASE provided the engineering design for all the structural components, including load calculations, pile layouts and reactions, and framing and structural reviews. Electrical engineering services included fire alarm system, electrical and light distribution, and emergency lighting. Mechanical engineering services included load calculations, air distribution, water distribution and sanitary design. BASE also performed a complete Building Code compliance review including life safety, fire safety, and egress.

Some of the project highlights include:

  • 450 individual executive level dormitory suites. (112,500 ft2)
  • 31,430 ft2 of core spaces including commercial kitchen, lounge and recreation areas
  • 4,200 ft2 of “Arctic” corridors to connect the units
  • 4,320 ft2 Transport Canada approved flight centre
  • Screw pile foundation for the premanufactured modular units
  • All required seals, drawings, and schedules for permits and occupancy
  • Site visit to confirm compliance
  • Entire facility is relocatable. Upon transfer to a different location, pile system is completely removable for minimum environmental impact

Imperial Oil Kearl Lake Camp Facility

Kearl Lake, Alberta

Disciples Involved

Structural, Mechanical and Electrical Engineering

Project Address

Kearl Lake, Alberta

Key Personnel