Beairsto & Associates Engineering Ltd. (BASE) provided the structural design and construction inspections for this tank mat foundation for the Frac Sand Transfer Station in Sexsmith, AB It is designed to accommodate six 2000MT silos. This project also included the engineered design of a cast-in place concrete rail pit used to convey sand.