Contact Us
Let's talk about your next project.

Looking for a new career with BASE?
View Our Current Job Openings.

Phone: 1-855-879-5973
Our Offices:
10940 – 92 Avenue, Grande Prairie, AB T8V 6B5
#102, 1212 – 1 Street SE, Calgary, AB T2G 2H8
3424 – 78 Avenue, Edmonton, AB T6B 2X9
 
Our Geotechnical Laboratories:
Unit 4 10902 – 92 Avenue, Grande Prairie, AB T8V 6B5
Bay 5 6115 – 4 Street SE, Calgary, AB T2H 2H9
3424 – 78 Avenue, Edmonton, AB T6B 2X9
BASE
  • This field is for validation purposes and should be left unchanged.
By submitting, you consent to Beairsto & Associates Engineering Ltd. processing your information in accordance with our Privacy Policy. We take your privacy seriously; opt out of email updates at any time.
 
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Contact Us
Let's talk about your next project.

Looking for a new career with BASE?
View Our Current Job Openings.

Phone: 1-855-879-5973
Our Offices:
10940 – 92 Avenue, Grande Prairie, AB T8V 6B5
#102, 1212 – 1 Street SE, Calgary, AB T2G 2H8
3424 – 78 Avenue, Edmonton, AB T6B 2X9
 
Our Geotechnical Laboratories:
Unit 4 10902 – 92 Avenue, Grande Prairie, AB T8V 6B5
Bay 5 6115 – 4 Street SE, Calgary, AB T2H 2H9
3424 – 78 Avenue, Edmonton, AB T6B 2X9
BASE
  • This field is for validation purposes and should be left unchanged.
By submitting, you consent to Beairsto & Associates Engineering Ltd. processing your information in accordance with our Privacy Policy. We take your privacy seriously; opt out of email updates at any time.
 
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
This project included the design and construction of a new water transmission line from the existing airport pumphouse to the existing water mains adjacent to the Grande Prairie Regional College
Some of the project highlights are:
  • The installation of 2.2km of directional drilled 450mm HDPE pipe, 450mm fusible PVC pipe, and PVC DR-18 pipe that was installed by trenching
  • Updating and modification of the existing pumphouse was required to accommodate the new transmission line and that design and supervision of that portion of the project was also undertaken by BASE
  • The extents of the project were managed by BASE from Tender of the project, to design, to contract administration and progress payments

Airport Transmission Waterline

Disciples Involved

Infrastructure Installation

Project Address

Grande Prairie Regional Airport to Grande Prairie Regional College

Key Personnel

Dennis Hussey, P. Eng.